1/20
Bodywork preparation on 86260 being carried out at Long Marston. Electrical overhaul work was being carried out in parallel. 86260 was renumbered as 86701.
- Author
- Paul Steane
- Created on
- Saturday, 28 March 2009
- Keywords
- Class 86
- Albums
- Visits
- 22359
